A S Sports Systems are pleased to announce that we have been awarded the contract; for the pitch removal and resurface at Trent College Independent School Nottingham | Derby

Site set up and the Rip up
Site set ensure’s the welfare of our and Trent College’s staff and visitors to site, along with the security of equipment…
High visibility clothing and Personal Protective Equipment are used at all times by staff on site for Health and Safety compliance.
In accordance with the rip up plan; so the carpet can be removed for recycling.
Trent College | Elms School | Trent Grounds 1
“First cut of the old Catterns Astro carpet being removed! Exiting times”
Said Mr James Gregory.
Director of Operations at Trent College & The Elms, co-ed independent schools in Nottinghamshire for pupils aged 0-18.


The removal of the existing carpet.
Surfaces removed
It has been a busy couple of days for the Team at Trent College, measuring and cutting the old surface to the rip up plan.

Ready for rolling each strip of turf up, before individually banding with tape and clips, with the aid of a telehandler and Q-fit bucket… As each roll weighs approximately 300kgs to 500kgs.

Once the turf has been rolled up and banded. The haulage company comes on to site for the Team to load the turf rolls, which are removed from site and re-used else where.

Carrying on with the surface removal the existing shock pad is also removed, to make way for the new McAdam to be installed..
Recycling
A S Sports Systems are pro-active in recycling and re-purposing as many materials from sites as possible…
If you would like to enquire about used Astroturf or shock pad rubber (which is processed and bagged for re-use) Please feel free to contact us…
https://www.as-sportssystems.co.uk/contact/
Tarmacadam
Due issues with the macadam plant, the sub-base of the Cattern’s surface was delayed. With the tarmacadam overlay completed on Tuesday & Wednesday of week 3!

With thanks to Hunts Contractors.
The levels have been checked throughout the installation of the tarmacadam, this ensures when the shock pad is installed that it will be on an even surface.
Synthetic Surface
The Synthetic Surface was then installed, the client for this project opted for Lano S Tec Integration Xperience GB. Including inlaid line markings for 1 x 11 a side hockey in white and 2 x cross-field hockey pitches in blue.
The pitch was installed in olive green , with blue run offs as per recommended guide lines for International Hockey Federation (FIH) surfacing specification, standards and accreditation.
This surface is a sand dressed surface, so upon completion of the install and line markings the surface the sand was spread.
For more details on Trent College: Independent School Nottingham | Derby